heavy duty milk crate mould

Plastic Crate Mould

heavy duty milk crate mould belongs to the Crate Mould under the Industry and Agriculture Mould. According to the different product styles, the Crate Mould can be divided into traditional style and personalized style, such as collapsible stroage container mould,plastic crate mould,fruit crate mould, etc.

Product Description

heavy duty milk crate mould belongs to the Crate Mould under the Industry and Agriculture Mould. According to the different product styles, the Crate Mould can be divided into traditional style and personalized style, such as collapsible stroage container mould,plastic crate mould,fruit crate mould, etc.


1. R&D:We suport customer R&D. Make the files or inprove the design if you needed.
2. Quotation Making:Mould quotation will be finished in 1 day according to information we get.
3. Negotation:The quality, price, material,delivert time, payment item ect.
4. Mould Design:3-5days for mould and product 3D/2D drawing design.
5. Mould:According to customers'request to build the mould before make the mould. We send mould design to customer approval first. Mould will be usually finished in 40-50 days.
6.Mould Testing:When moulds are finished, we test the moulds to check it satified consumers' needs.And we will send samples for consumers'reference.
7.Sampleshoot:If the first sample come out is not satisfied customer. We modify the mould and until meet customers' satisfaction.
8. Delivery:Delivery goods by sea or by air, according customers requirement. 

Name: Factory direct produce quality plastic shelf injection mould 
Mould material:NKA80,S136, 2316,2736,H13,718H,P20,45# ect.
Product Material:PP,PE,PC,PA,PS,PU,PVC,PMMA,ABS ect.
Cavity No.:Single or multi.
System of runner:Hot runner,cold runner,pin-point gate,hydro-cylinder etc.
Time pf mould production:45 days -60 days.
Guaranteed Number of Cycles:300,000-3,000,000 
Mould design software:UG,IGS,STP

molds we make

MOULD MAKING

1.Samples/Drawing &Requirement from you

2.Mould design:we will Communicate and Exchange the opinion with you after you place order.

3.Material Purchase:Steel cutting and Mould base tooling.

4.Assembling.

5.Inspection of mould : following and controlling the tooling processing.

6.Mould testing:We will inform you the date.Than will send the sample's inspection report&injection parameters with the sample to you!

7.Your instruction &confirmation for shipment.

8.Ready made mould before packing.

Frequently ask question

A: Heya is plastic mold and injection molding manufacture in Taizhou of China, welcome to visit us.

A:We will submit the quotation in 24 hours if getting detailed information during working days. In order to quote for you earlier, please provide us the following information together with your inquiry:

1)3D Step of Files and 2D Drawings

2)Material requirement

3)Surface treatment

4) Quantity (per order/per month/annual)

5) Any special demands or requirements, such as packing, labels, delivery, etc

A:1). Materials inspection by IQC;

2). During processing, our IPQC will check the injection molded parts every

3). hours, ensure no any rejects;

4).FQC will check the products before sending to the warehouses

5).100% inspected by QC before shipping out.

A: lf receive defective product, please send us the photos, we will feedback to our engineers and QC departments and solve the problems ASAP.

A:1). For moulds, we will be coated one-layer anti-rust oil first, and then also will be covered thin films on the mould, finally pack into fumigation wooden case.

2). And as to products, we will pack into standard export cartons or as per customer's request to pack.

Reviews

Verification code: 验证码

Related Mould